HVAC Installation Case Studies & Success Stories

Our Success Stories

Dakin-Jet-01.JPG

Case Study – Prologis DC2, Hams Hall, Birmingham

DC2.png

Project Overview


Customer Name: Prologis (via TanRo)


Industry: Logistics


Type of Building: Large Warehouse (new build)


Location: Hams Hall, Birmingham (M42)

DC2 is part of the prestigious Prologis Park Hams Hall, a major hub for distribution in the UK.


TanRo, the appointed fit-out contractor, partnered with Jet Environmental Systems to ensure frost
protection for the internal fire sprinkler system in this high-value facility.


Project Background


Type of Application: Frost Protection


Goals of the Customer:


- Ensure robust frost protection for the fire sprinkler system in a new warehouse
construction.


- Adopt an environmentally friendly solution aligned with Prologis’ sustainability
objectives.


- Install a reliable system capable of operating in challenging winter conditions.


- TanRo, on behalf of Prologis, required a solution that would safeguard operations
and assets in cold weather while maintaining a high standard of environmental
responsibility.

dsc_0001-2.jpg

Our Approach / Solution


• Site Assessment & Analysis:


- Our engineers conducted a detailed analysis of the buildings size, insulation, and
heating requirements to determine the best frost protection strategy. The key
challenge was ensuring efficient heat generation in freezing conditions using an all-
electric solution.


• Recommended System:

- We implemented an air-to-water heat pump system combined with a buffer tank to
meet the high heating demand. Warm water is pumped from the external heat pump
to an indoor air handling unit.


- This solution addresses the inherent challenge of heat pumps operating at low
temperatures by providing thermal storage and continuous heat delivery.

• Key Data:


- Winter Internal Temperature: 5°C
- Winter External Temperature: -5°C
- Dimensions: 194m (L) x 118m (W) x 15m (Eaves H) / 17m (Ridge H)
- Area: 22,892m²
- Volume: 366,272m³
- Heater Duty: 300kW
- Air Supply: 10m³/s


- Project Duration: The project was completed successfully over a 3-month on-site
installation period, meeting the deadlines set by TanRo and Prologis.

DSC_0575.JPG

Customer Feedback/Quote


“Jet Environmental Systems delivered an outstanding frost protection solution for our project at
Prologis Park Hams Hall DC2. Their technical expertise, attention to detail, and ability to provide a
sustainable all-electric system that performs reliably in challenging conditions has been invaluable.
We are extremely satisfied with the results.”

Mike Wall, Contract Manager, TanRo

How This Case Applies to Similar Clients


This project highlights how businesses can integrate sustainable frost protection systems in both
new-build and retrofit applications.


The heat pump solution is particularly well-suited for companies looking to reduce their carbon
footprint while maintaining reliable operations in large-scale facilities.


Interested in similar results? Contact us at Jet Environmental Systems today to learn more about
our energy-efficient solutions for frost protection, heating and temperature control.